Sprint Planning

Sprint Planning 12 minSprint planning commits the team to one clear goal for a short, fixed period, with work sized to the capacity the team really has after leave, on-call and everyday overhead.

Sprint Planning

At Meera's first sprint planning as manager, the team pulls in twenty tickets, the same as always. Nobody mentions that Kabir is on leave for four days, that Arjun is on call, or that the sprint should end with something customers can use. Two weeks later, half the tickets are unfinished and nothing has shipped.

The rule

Plan for the team you'll actually have, around one clear goal.

Most software teams work in an agile way: short cycles, often one or two weeks, with something usable at the end of each and a look back to adjust before the next. Scrum is a popular version built on fixed-length sprints. Kanban drops sprints and instead limits how much work is in progress at once. Whatever the flavour, planning comes down to three things.

  • Capacity. Count the working days the team actually has. Take off leave, holidays and on-call duty, then leave room for meetings, code reviews and surprises.
  • A sprint goal. One sentence that says why this sprint matters: "Customers can save a card and pay with it on Android." A list of ticket numbers is not a goal, because it can't help you decide what to drop when things go wrong.
  • Pulled work. Take the highest-priority items that serve the goal, until the estimates fit the capacity with some slack left over.

The team estimates and commits, not the manager. Meera's job is to run a good conversation: bring the capacity numbers, make the trade-offs visible, and protect the plan from work that tries to sneak in halfway through.

The shortcut

Work in this order: capacity first, goal second, tickets last. If you start from the tickets, you plan for a team you don't have.

Planning a two-week sprintStep 1 of 4
  1. Count capacity

    Five engineers × 10 days = 50 days. Kabir is on leave for 4, leaving 46. Arjun is on call and counts as half, leaving 41. Meetings and reviews take about a fifth, so the team has roughly 33 days of focused work.

The common mistake is planning to 100 per cent of capacity. Unplanned work always arrives, so a completely full plan is a plan to miss.

Drills

Answer fast — trust the rule.

quick drill

Which of these is a sprint goal rather than a to-do list?

quick drill

A team of four engineers has a ten-day sprint, and one of them is on leave for five days. How many engineer-days does the team have before meetings are taken off?

quick drill

Who should estimate and commit to the sprint's work?

quick drill

Why leave slack instead of planning to full capacity?

Remember

  • Plan for the team you'll actually have, around one clear goal.
  • Capacity first, goal second, tickets last.
  • Never plan to 100 per cent; leave slack for the work nobody scheduled.

Practice — level up

0/1 solved

Write your answer, then compare it with a rubric and a model answer.

ExplainPlan a real sprint

Your team has six engineers and a two-week sprint. One is on leave for three days, one is on call, and there is a public holiday. Explain how you would work out capacity, write a sprint goal for a feature of your choice, and decide what to leave out.